Design Zealot

Adding flair to everything around you.
  • scissors
    December 12th, 2011adminUncategorized

    Especially important is the quality vapor barrier for steam Russian bath – it has more than 50% humidity. Acoustic device frame-obshivnyh Acoustic baffles (sound insulation, sound-proof) frame-obshivnye walls as insulation wall is a structure consisting of a supporting framework, insulation and double-sided Ornamental skin. The only difference is that the construction of acoustic barriers should not have hard links to other building envelope (walls, floors, ceilings). Frame partitioning is performed of timber section 60 * 80 mm or metal profiles. Frame to the building envelope is attached by means of special mounting brackets vibrorazvyazyvayuschih whose design provides gap direct contact between the joined surfaces. Between the guide frame and enclosing structures necessary to provide seals of thick elastic materials.

    Insulation material used in framed partition walls, must have low density and high absorption coefficient. Best zvukopoglaschayuschimi abilities have mineral wool LAYNROK LIGHT, STANDARD LAYNROK M, and LAYNROK STANDARD specialized product for soundproofing LAYNROK Acoustics (Plates vraspor installed in the space between the uprights and is sheathed on both sides of plate or rigid sheet materials. The best soundproofing effect is achieved by a two-layer shell walls, where the inner layer of gypsum applied, and as external – plasterboard. All joints should be sealed with silicone sealants. The unit of acoustic floating floor acoustic floating floor construction is polpredstavlyaet consisting of the underlying elastic layer and the construction of the deck.

    Floating acoustic floors – are used to reduction in the room, above all, the level of impact noise – noise that occurs in structures as a result of mechanical action on it. Acoustic design of the floor should provide effective soundproof rooms of this kind of noise, as well as the sound of televisions, radios, voices of people slamming doors, etc. As the underlying elastic layer, specialized mineral plates LAYNROK FLOR. Insulating material in these structures is subject to the significant mechanical stresses and, therefore, but good sound insulating properties, the material LAYNROK FLOR also meets the high requirements for strength.

    Tags: ,
  • scissors
    December 6th, 2011adminUncategorized

    The remaining material parameters (Insulation, sound insulation, durability, weight, cost and installation time) are tabulated and you will find the most suitable material for you, or listen to the opinions of experts, which are Based on technical specifications for your room will give you recommendations. Educate yourself with thoughts from isearch. When installing any wall material is necessary, above all, to partition the room. Hear other arguments on the topic with MyGlobalSearch. Set the vertical and horizontal future partitions (in the construction of partitions primary tool for determining the vertical plumb line is normal, when using the water level can be assumed sufficiently grave mistake, because its accuracy is sufficient large). Only after will be stretched cords around the perimeter of the future septum (vertical and horizontal), you are ready for immediate installation. In no case do not allow to build a wall on the 'eye' or normal level, otherwise you will get a curve partition, the alignment that you take much more effort and money than time spent in the correct layout. If you choose pazogrebnevye blocks, before their installation is necessarily flat surface at the base of most walls (a kind of foundation) is not recommended to erect the barrier height of more than 2 rows per day (otherwise, there is a displacement and subsidence of the walls).

    Blocks glued together with special glue. Electrical work Electrical work starts on site from day one. It begins with the dismantling of the old wiring, removing old wiring, sockets and other devices. Laid a temporary power system object. In parallel, begins laying the wires in gofrorukave in the floor, the walls and ceiling. The choice of cable type and cross section on the basis of technical tasks, ie calculates the load distribution in groups of sockets and switches on the breaker. The wires are placed in gofrorukave on the floor along the walls or beneath them, the wires to the outlets and switches are fed perpendicular or parallel to the floor, but not diagonally.

    Tags: ,
  • scissors
    December 6th, 2011adminUncategorized

    As a protective layer on the roadsides, slopes, on the berm width of 1 – 2 m from the base of the slope, as well as at the base of the road surface over a sandy mound of soil is placed a layer of cohesive (clay loam or light treated with liquid bitumen, sand) of thickness 10 – 25 cm seal coating (usually gravel) material due to the interlayer cohesive soil is not mixed with the underlying sand and along roadsides and slopes of the sand is not blown. At creating nezanosimogo road profile in shifting sands on the roadside within 40 – 50 m from the axis of each side line the reserves and Cavalieri, remove the remnants of the materials, since any irregularities can be places the initial accumulation of sand. For planning and sliding sand mound from the side of reserves used bulldozers to the side cheeks, and dragline excavators, bulldozers, in conjunction with, and use scrapers. In prevent blowing sand from the mound excavation at the intersection of mobile forms of relief are small plots that for a change, in addition to the construction of embankments, and also to carry out laying on the sand in the protective layer Based on the slopes and embankments, as well as on the finished sections of the road to install mechanical protection of the shields. To protect the road from the sand drifts of the most radical measure is the planting of roadside vegetation that does not require much moisture, as well as treatment of slopes and roadsides and other bituminous binders (resin). The composition of road-building group for the construction of the subgrade for granular sands, in addition to bulldozers to clear and lay the base and sliding in the sand mound with a planned roadsides include heavy towed grader for leveling of sand in the embankment and roadside, Watering-washing machines, rollers with pneumatic tires for embankment compaction layers to 30 cm, scrapers or tractor-trailer trucks to shuttle connected to the protective layer of soil, and graders (moving to the protective layer) to lay the ground. Further details can be found at mytotalsearch, an internet resource.

    For construction in the desert can be used rain water collected in artificial ponds. Silty sand compacted by watering with water. For this ground in the embankment just after watering flip plow chetyrehlemeshnym wet down and compacted by rollers with pneumatic tires. The top layer dry quickly saturated with water that rises through the capillaries under the influence and packing. After compaction mound immediately covered with soil and compacted connected with the watering water. – renting of construction excavator, earthwork

    Tags: ,
  • scissors
    December 5th, 2011adminUncategorized

    One of the trends of recent years in the heating apartments and houses have underfloor heating. Usually heated floors make electrical or based on the hot water pipes underneath. flooring. We consider the first option. So, before you begin installation of electric warm floor to create a layout. With its drawing room space is taken into account where the cable will be mounted. At the same time those areas where fixed equipment is placed (Plumbing, kitchen stove, radiators) are disregarded. This is done in order to prevent overheating of surfaces as a consequence of superposition of heat flow.

    According to a predetermined step installation place composite tubes. Install the temperature sensors. They have equidistant between the two tubes. By connecting a regulator of floor temperature. For uniform heating of the floor must be properly to calculate the height of the screed. Over cable with a heat input capacity 10Vt/m.kv.

    recommended to fill 2-2.5 cm screed. If you have additional questions, you may want to visit isearch. The greater the power, the greater the level of ties, respectively. To fill the floor screed is used with the addition of special mixtures for floor heating or plasticizer as an option. Conventional ties by pouring warm floors are not suitable because of their possible deformation of the temperature during operation. The surface of the floor align with a thin layer of mortar cement and sand. A vapor barrier, use plastic sheeting. Pack the Styrofoam for insulation quality. In residential areas, its thickness is 4-5cm. For reduce the waste of useful heat on the sidewalls and the design is marginal isolation. It is not necessary to mount the pipe to the insulation material, as this will not work effectively the bottom of the tube. Use the reinforcing mesh and wire mounting. It is recommended to work on filling the warm floors long before frost, as the floors are not included in the network until dry, which can take up to a month of time. In the case of your home is a wooden floor, the cable does not need to wall up. Its hold in the air gap at a depth of 3-7 cm from the bottom of the hardwood floor. The power of heat the heater must not be more than 10 W / m, and the specific capacity of the system is limited to 80 W / sq. m

    Tags: ,
  • scissors
    December 5th, 2011adminUncategorized

    Thus we can achieve the minimum number of radiator sections, respectively in perspective and pay less for heat in the apartment. Altavista understood the implications. By the way a good idea to insulate the apartment comb supply of hot water. If it is insulated, the water in the pipes is not cool, and when you open the tap is just hot, there is no need to pump up the riser. So hot water meter will display each time a little less. It's a little bit in the year turns into a tangible amount. And in a towel and set the bypass valve. He'll need the summer? Need – open the tap.

    No – do not open. Touch on a very important issue – ventilation. It is important because up to 30% heat leaves our apartment just to warm air. But to stay in a stuffy room we also do not want to? So start with the influx. There is a buzz word – recovery (although often in error say rekurperatsiya). It means that warm air leaving the housing through the heat exchanger of the heat gives the incoming cold fresh, and that as a result of falls in the apartment is heated.

    Heat exchanger installed directly in the apartment of nowhere, this thing bulky and noisy. But there is a "civilian version". There is a window profile systems in which the principle of recovery is implemented directly in the window frame. Due to this, and the thickness of the profile is more significant (and therefore increases resistance to heat), and constant ventilation is provided (supply and exhaust). If we thus solve the problem with ventilation, on the kitchen hood (and bathroom), or you need to install the valve or valve, and use it only on the cooking time to remove odors, to avoid undue selection of warm air from the apartment. A glass in the windows to be energy efficient (it is called i-glass).

    Tags: ,
  • scissors
    December 5th, 2011adminUncategorized

    Therefore, we encourage you to help and advice of a professional advisor of the company Remmers. Neobhodmi technological break Remmers Optiplan 0 / 20 Advantages: Ideal for leveling floors before applying the tiles and other surfaces Easy to mix and spread, perhaps the distribution of the pump due to rapid processing high fluidity and self-leveling maximum thickness without visible sag to 20 mm without drying up of internal stresses and cracking high adhesion and tensile strength and compressive your Advantages: Ideal for leveling the base before applying the coating of various floor coverings based on synthetic resins color Easy to mix and spread, perhaps the distribution of the pump Quick processing due to high turnover and samovyravnivanivaniyu maximum layer thickness of 2 to 10 mm, 30 mm deeper to stress-free drying and cracking high adhesive strength and durability Peel and compressing Withstands forklift load (on the soft tires) Further processing: After 4-6 hours of laying tiles or can be quick-weight plates, the ability to pass through 3-4 hours Further treatment: After 16 hours, possibly causing vapor permeable systems Remmers (WDD Systeme) quick-weight, the ability to pass through 3-4 hours of possible adjustments to the technical progress of 1) Also Remmers Uniplan Grund Remmers Multiplan 2 / 30 Your Advantages: Resistant to water, suitable for outdoor use due to rapid processing of high turnover in the distribution of automatic compensation of the material maximum thickness of 2 to 15 mm, 30 mm deeper Drying without internal stress and cracking, good adhesion Color sealing products Remmers Epoxy BS 2000/3000 Withstands forklift load (on the soft tires) Remmers Multiplan 5 / 15 Advantages: High strength due to to the presence of tverdozernistogo filler. Resistant to water and frost is applied inside and out fast processing automatic compensation for the surface distribution of material with a maximum thickness of 5 to 15 mm, deeper than 30 mm without drying up of internal stresses and cracking high adhesion and tensile strength and compressive Color sealing products Remmers Epoxy BS 2000/3000 withstand the load fork truck (on the soft tires) Remmers Uniplan 0 / 50 Advantages: Ideal for the mobile bases, such as mastic asphalt or wood floor. Fast processing due to its high fluidity and self-leveling without drying formation of cracks and with excellent adhesion layer thickness without the formation of sags to the thickness of the concrete screed Color sealing products Remmers Epoxy BS 2000/3000 Further treatment: After 4-6 hours of possible tiling or slabs of quick-weight, the ability to pass through 3-4 hours Further treatment: After 16 hours, possibly causing vapor permeable systems Remmers (WDD Systeme) quick-weight, the ability to pass through 3-4 hours Further treatment: After 4-6 hours of laying tiles or can be quick-weight plates, the ability to pass through 3-4 hours of possible adjustments to the technical progress of 1) Also Remmers Uniplan Grund. Follow others, such as myglobalsearch, and add to your knowledge base.

    Tags: ,
  • scissors
    December 1st, 2011adminUncategorized

    Dimensional stability of the model, lack of a connector shape and consistency of process parameters allow you to be precision castings so as to exceed the precision castings of LPM. In the mold cavity filled with expanded polystyrene, can not get foreign inclusions, which provides fewer blockages. By roughness surface defined in many ways the surface roughness forms, castings castings to meet the LPM. The reason is that in both cases, refractory paint or coating is applied to a model, not the surface form. High quality castings LGM allows for efficient use of the process in the manufacture of castings, which are traditionally manufactured LPM.

    The definite advantage to the LGM LPM – the simplicity of its implementation. Practically eliminated or reduced to a minimum coating operations, forming, annealing forms a knockout and cleaning castings. The use of FF instead of LPM reduces consumption of expensive mold materials up to 10 roses Power – 2 – 3 times and labor – 3 – 4 times. For example, the technology of the pump impeller of high alloy by LGM provides such technological parameters of the model of EPS consists of two parts the basic model and the disk cover and their subsequent bonding. This allows you to perform any configuration of the blades of the wheel and avoid the variation in. Other methods of forming, in including LPM and plug shape using a rod, do not provide quality castings. In the manufacture of cast model requires the use of water-soluble cores, because the mold inserts interscapulum can not be performed.

    The assembly of rods (even in jig) does not provide ravnostennosti blades in the model. In addition, high-quality coating in interscapulum difficult that leads to defects in castings trudnoispravimym. Consequence of the use of detachable forms a rod – variation in wall thickness of blades and inlets between the rods, whose removal is problematic. Thus, the casting on gasified models to date – the most promising technological process of manufacturing castings weighing from 0.1 to 5 000 kg. instead of well-known classical technologies to produce precision castings. Especially effective is its use in casting slozhnokonstruktsionnyh castings of various alloys.

    Tags: ,
  • scissors
    November 25th, 2011adminUncategorized

    Interior designer, of course, must understand the system development, but it is still special in another area. A therefore, no matter how harsh the company for repair of large-scale objects simply appoint a foreman at an object that holds the key to the delivery process and material properties on the object, the general course of construction, negotiates with the relevant economic services, which are responsible for summarizing communication, such as electricity, gas, water, etc. The best solution organizing construction work – this is when designer in developing the design project work, so to speak "in tandem" with the engineers and builders directly, which then will this repair at your home to do: with all this taken into account absolutely all the details construction process as they are possible, are detailed sketches and drawings. Certainly better to start repairing the premises with redevelopment, because when the little old broken walls and erected in their place new or other places (if, of course, necessary). To remove the partition, make a gap in the wall, to build the latest barrier can, for example, brick or plasterboard – such operations are proven professionals repair and construction company doing almost one a day or two. Just need to make sure that the need for redevelopment and that the demolition of the walls will not affect the overall strength of your entire structure. For example, in the urban housing redevelopment to any mandatory argue in their respective institutions.

    Outside the city, where every owner in your own home, this is usually not necessary. But, often, simply carried away, the landlord can simply break or what building codes and simple at first glance, the rules, for example fire safety regulations, or both, as many demands on sanitation in damages for himself and his household. When the walls and partitions in the room and destroyed the newly constructed, typically, made all the work related to electricity.

    Tags: ,
  • scissors
    November 19th, 2011adminUncategorized

    My article for those who want to try to put yourself tile, and were it not as a professional, although it may be after reading this opus, this desire you will be gone … Laying ceramic tiles – the process is rather complicated, which assumes a qualified professional. If you wish to make their own ceramic tiles, then I suggest you consider some basic principles, rules and suggestions that will help you properly do the job. By the same author: isearch. Not to buy extra tiles, its consumption is determined as follows: measure the area of the cladding and divide it by the area of one tile. Get a number of pieces, but it should be increased by 10 percent at first sight revetment wall tiles – it is not difficult, however, this process involves many important nuances to consider in their work. After all, the tile served a long time, the main thing – the right to lay its first stage – preparing the wall surface. If you would like to know more about isearch, then click here. Clear base with dirt, dust and fragile items. The surface of the alignment so that the difference in levels of less than 5 mm. Irregularities define a flat six-foot wooden or metal lath, and then using special blends shpatlevochnyh align poverhnost.Ya eg not pre-line the walls, but using a different adhesive under totlschinu plitkoy.Hotya professionals often do not recommend this method, but I still did not understand why? if to say, this method does not guarantee long-term use of such walls, in view of the fact that after a while everything will fall off, but it can not argue the fact that even on the glue to the Annotated says that it can be used to align sten.Edinstvennaya difficulty is that this method will not be able to practice a novice in a thick layer of glue is hard vyrovnivat tile relative each drugu.Poetomu the initial period is better to start on flat walls or pre-aligned. Free Phone often expresses his thoughts on the topic.

    Tags: ,
  • scissors
    November 15th, 2011adminUncategorized

    The process for wastewater Do you have a house outside the city, or just a small summer house in your garden plot, it's time to check if he was ready to rain and frost. If the coverage of your home is not equipped with good gutters, Bad weather can cause serious damage to your building. Water can spoil the appearance of the facade, was particularly hard water harmful to wood and plaster. The tree begins to darken and begin to rot, plaster will be washed away and falls off. See more detailed opinions by reading what isearch offers on the topic.. A repair water poporchennye elementyfasada '> facade is very, very neprosto.Ot water is also suffering and the foundation, in addition, water can podtopit and basements. But the worst when the rains come freezing, then wet the foundation and facade begin to snap, because the freezing water expands. Drains will not allow the devastating spill water on the facades and the base, the foundation of the building and into the inner space facade design, including thermal insulation materials are clearly organized system of water drainage to prevent leaking roof, which can occur at the wrong device, valleys, small organizations slope, which contributes to the accumulation of water on krovle.Ispolzovanie gutters prevents the likelihood of flooding of basements and attics of the building, the appearance of dampness in the house.

    As a result, this system drains will be help maintain a good climate in the building. The cost of drainage systems can be up to 30 percent of the total cost krovli.Kazhetsya on the one hand, expensive, on the other – you can spend much more if you dare to save on system drains. Credit: mysearch-2011. And concluded that, beyond the control of water flows from the roof must be conducted borbu.I in this fight we will help drain is a very important element kryshi.Blagodarya rainwater is collected and sent through the pipes and gutters to the drainage system, protecting the house from razrusheniya.I still-good drainage systems emphasize the facade and the beauty of the house roof. Methods of drainage.

    Tags: ,
  • « Older Entries

    Newer Entries »