Design Zealot Adding flair to everything around you.
  • scissors
    May 6th, 2011adminUncategorized

    Many professional designers do not take eskizirovat on construction drawings without measurement, and it is absolutely correct, because the project will be tailored to suit all the nuances of specific existing premises. Isearch understood the implications. When sketching, ie search for solutions and their graphic representation, the designer primarily works with the plans and scan the walls, which new partitions, furniture, lamps, etc. In some cases, a set of 2-3 colored plans and developments on the walls is sufficient for preliminary design, but not always: much better than the planar orthogonal image, the customer understand the perspective image space. You are therefore entitled to claim from the designer-quality figurative drawing work to create colored perspectives. The best option in this cases is the visualization (simulated on a computer photo realistic images). Draft project take you so important that all ideas and solutions on the project you have been understood. If everything is vividly represented in the proposed number of documents you draft design (at least 2-3 plans for each room plus a sweep along the walls or plans plus' manual or computer perspective, at least – perspective view) and all approved, then comes a moment of intense work for your designer – he created what we conventionally call 'working draft' and you relax and impatiently waiting for When designing a private interior designer at no need to perform a full working papers in accordance with gost, because She too zaformalizovana very laborious to perform, and has meaning only when creating projects of interiors of public buildings as set of drawings of ar in the total reconstruction project.

    Therefore, in your case, the designer must provide a set of drawings and images necessary and sufficient condition for realization of the builders of the project ideas. Let Foreman himself evaluate and approve a set of documents, taking them to execution. But in any case to a project should include: tonnage plan (or obmerochny drawing); plan level (in the nation – a plan partitions); Layout of furniture and equipment Plan ceilings Floor plan Layout of electrical equipment. Construction drawings, blueprints of heating and ventilation, water supply and sanitation designer does not comply. The need to design furniture in the project should be negotiated in advance with the contract for the design.

    Tags: